PBWP has been proudly serving the towns of Penacook and Boscawen since 1892. Our goal is to ensure safe and clean water is available to all our town residents and businesses. Standard service days are Monday, Wednesday, & Friday. Emergency service is available 24/7.

PBWP RATES APRIL 2020

PBWP WARRANT 2020

PBWP FINANCIAL STATEMENTS 2018

PBWP PROPOSED BUDGET REPORT 2020

Fee Schedule as amended Addendum Schedule of Rates and Fees Effective - April 1, 2020

Schedule B-1, Fee Schedule as amended

Addendum Schedule of Rated and Fees effective April 1, 2020

* All service/labor rates based on M-F 8:00 am to 3:30 PM.  Double for other times.

Established availability charge including 300 CF based on meter size (see below).

     
Base Rate $32.00 for house meter  
Water Rates $5.97  per 100CF  
Service turn off visit* $100.00 at customer request  
Service turn off visit* $100.00 for non-payment  
Service turn on visit* $100.00 at customer request  
Service turn on visit* $122.00 for non-payment
$244.00 after hours
 
Collection Visitation Fee $35.00
 
Meter Installation*
Frozen meter*

$175 for 5/8 meter, $100 radio box            

$100/hr Labor – larger meter extra

$100/hr Labor plus Materials

 
Late payment fee $10.00 plus interest on overdue balance. Imposed on second billing and shut off notice
Return check fee $40.00  
Final reading* $75.00  
Initial reading* $100.00 includes setting up new account, credit check, etc.
Pool fill from hydrant* $150.00  
Truck fill from hydrant* $70.00 up to 7000 gallons.  Trucker supplies own equipment.
Private Hydrant Fee $47.00/month, grandfathered for hydrants before 2015
Sprinkler Fee
$60.00 /month
Interest on past due balances 1.5% per month billed monthly
Contractor bulk use* $50.00 from hydrant plus metered us at $5.50 per 100 CF
Connection fees* Single family residence $2500.00  WIF plus expenses, inspection and engineering fees, as necessary)
Connection fees* 2-3 unit residences $1750.00 per unit
Connection fees* 4+  unit residences $1500.00 per unit
Connection fees* Commercial up to 1” service $3000.00 per unit
Connection fees* Commercial up to 2” service $4000.00 per unit
Connection fees* Commercial over 2” service $5000.00 per unit
Water Investment Fee (WIF)   New Housing 2 bedroom $3000.00 plus $500 for each additional bedroom
Meter removal or reinstallation Hourly rate of $135.00 per technician plus materials
Meter check accuracy *
N/C if fault is found w/meter: hourly rate of $100.00 per technician plus materials if no fault is found
Locate shut off at curb * Hourly rate of $135.00 per technician plus cost of landscaping or pavement repairs
Temporary meter deposit $250.00 to $1500.00, depending on size
Technician labor charges * Hourly rate of $135.00 per technician
Inspector labor charges * Hourly rate of $135.00 per inspector
Engineer labor charges * Hourly rate of $200.00 per engineer
Commissioner labor charges Hourly rate of $50.00  
Bookkeeper labor charges Hourly rate of $85.00  

 

PBWP WARRANT 2018

PBWP FINANCIAL STATEMENTS 2017

PBWP BUDGET REPORT 2018